click on an image to enlarge and open a slideshow

Density Testing
Start Of The Elevator
Walls of Elevator Pit
Drill Rig In Action
The Drilling For Elevator Casing
Finished Elevator Pit
Mortar Mix Silos Arrive
Reaching First Lift Height
Start Of Plumbing
Plumbing Installation Moves Along
Start Of Main Floor Deck
New Deck In Place
First Concrete Truck
Main Floor Ready For Concrete
Start Of Concrete For Main Floor
The Elevator Piston Arrives
P8160204
P8180206
Elevator Shaft Built Up To Roof
Excavating Begins For Pipe Work
 
 
Powered by Phoca Gallery